Complete was engaged by AUT through Hargrave management to carry out the refurbishment of Level 3 of the AUT Library, working along-side Archmedia Design and the client to complete the project during the universities traditional summer recess.
We manufactured the joinery in house, the process taking 8 weeks from approval through shop drawings, manufacture, and installation on refurbished floor.
The space now provides a casual break-out environment for students to study and collaborate.